The text of the $450M school facilities bond goes into exhaustive detail on the specific improvements planned at each site. Skimming the text reveals that many improvements are planned at almost every site. So I did some sorting and sifting and came up with a list of the most ubiquitous improvements. These items appear in almost all of the site plans, and provide a good overview of what this bond measure is about.

The following list items are taken directly from the initiative text, but have been rearranged and condensed by my sorting and sifting process. Many of the most important improvements, such as bungalow replacements, are omitted because they only occur in some sites. For the real story on what this initiative entails, please read the full text.

Major Building System Repair/Replacement/Installation
  • Repair or replace cast iron pipes in the sewage system
  • Repair or replace copper pipes in domestic water system
  • Repair or replace electrical system
  • Repair or replace plumbing system
  • Repair or replace roof as needed
  • Repair, replace or install phone system
Restroom RenovationsGeneral Improvements and Site Repairs
  • Cabinets will be repaired or replaced as needed
  • Interior ceilings and walls will be repaired as needed, primed and painted
  • Level landings in paved areas
  • Modification of grates in paved areas
  • Partial or complete replacement of ceilings as needed.
  • Replacement of damaged lockers.
  • Replacement of door hardware
  • Doors not replaced to be stripped, resealed and painted
  • Replacement of gates
  • Restroom fixtures will be replaced as needed
  • The interior and exterior of the building to be painted as needed
  • Window frames not replaced will be stripped, resealed and painted
Health and Safety Needs
  • Install fire detection system
  • Install fire sprinkler system
  • Installation of door mats
  • Modification of door alcoves
  • Repair and/or replacement of classroom sinks
  • Repair and/or replacement of handrails in interior and exterior stairways
  • Repair and/or replacement of interior and exterior drinking fountains
  • Repair and/or replacement of ramps, including handrails
  • Repair concrete sidewalks and pathways
  • Repair or replace air grills
  • Repair or replace chain link fencing
  • Repave damaged asphalt in parking lot and in playground
  • Striping of all stairs
Accessibility Work
  • Installation of assistive listening devices as needed
  • Installation of room and directional signage
  • Lower electrical switches
Environmental Improvements
  • Repair or replace air handling unit
  • Repair or replace heating system, including boilers, hydronic heating units and gas and steam pipes
  • Where work will be done in areas with Asbestos Containing Materials (ACM’s), those ACM’s will be removed and replaced with new materials. Lead paint will be removed from any area that will have construction.

1 Comments:

At Wed Aug 16, 03:39:00 PM, Blogger Eric Mar & SF Area Activists said...

Thanks for posting the meat behind the bond. Too bad matier and ross in the sf chronicle keep trying to portay the bond as some kind of unneccesary back-room deal.

 

Post a Comment

<< Home

May 2005, June 2005, July 2005, August 2005, September 2005, October 2005, November 2005, December 2005, January 2006, February 2006, March 2006, April 2006, May 2006, June 2006, July 2006, August 2006, September 2006, October 2006, November 2006, December 2006, January 2007, February 2007, March 2007, April 2007, May 2007, June 2007, July 2007, August 2007, September 2007, October 2007, November 2007, December 2007, January 2008, February 2008, March 2008, April 2008,